Skip to content

Latest commit

 

History

History
74 lines (55 loc) · 8.69 KB

readme.md

File metadata and controls

74 lines (55 loc) · 8.69 KB

Project Planning and Technical Documentation

1. Group Members

The members of the group:

Student Nr. Name Github Profile
1221694 João Pinto João Pi profile
1220612 José Sá José profile
1201804 Rafael Araújo Rafael profile
1220777 Rui Lima Rui profile
1221700 Vasco Sousa Vasco profile

2. Sprint Planning

Sprint Duration EAPLI LAPR4 LPROG SCOMP RCOMP
A 25/02/2024 - 06/04/2024
B 07/04/2024 - 04/05/2024
C 05/05/2024 - 08/06/2024

3. Task Assignment

The assignment of tasks (requirements/user stories/use cases) during the project.

Student Nr. Name Sprint A Sprint B Sprint C
1221694 João Pinto US G001 US G002 US G003 US G004 US G005 US G006 US G006 US G007 US 2001 US 2002 US 2003 US 1014 US 1017 US 2001b US 4000
1220612 José Sá US G001 US G002 US G003 US G004 US G005 US G006 US G006 US G007 US 1006 US 1006b US 1009 US 1013 US 2004 US 3000 US 3002
1201804 Rafael Araújo US G001 US G002 US G003 US G004 US G005 US G006 US G006 US G007 US 1001 US 1003 US 1007 US 1012 US 1004 US 1018 US 1019 US 1020
1220777 Rui Lima US G001 US G002 US G003 US G004 US G005 US G006 US G006 US G007 US 1011 US 2000a US 2000c US 1021 US 3001 US 3003
1221700 Vasco Sousa US G001 US G002 US G003 US G004 US G005 US G006 US G006 US G007 US 1000 US 1002 US 1005 US 1008 US 1010 US 1015 US 1016 US 2000b

4. Global Artifacts

Global Artifacts

5. LAPR4 Self Assessment

This section is mandatory for students of LAPR4

Sprint A

Student Nr. Name Justification Engineering Process Issues and Version Control Team Work Deployment Integration Req. Satisfaction
1221694 João Pinto 1221694 - Justification 5 5 3 4 5 4
1220612 José Sá 1220612 - Justification 4 4 3 4 4 3
1201804 Rafael Araújo 1201804 - Justification 5 5 4 4 5 4
1220777 Rui Lima 1220777 - Justification 4 3 4 3 3 3
1221700 Vasco Sousa 1221700 - Justification 5 5 3 4 5 4

Sprint B

Student Nr. Name Justification Engineering Process Issues and Version Control Team Work Deployment Integration Req. Satisfaction
1221694 João Pinto 1221694 - Justification 5 5 4 5 4 4
1220612 José Sá 1220612 - Justification 5 5 4 5 4 4
1201804 Rafael Araújo 1201804 - Justification 5 5 4 5 4 4
1220777 Rui Lima 1220777 - Justification 4 3 3 4 4 4
1221700 Vasco Sousa 1221700 - Justification 5 5 4 5 4 4

Sprint C

Student Nr. Name Justification Engineering Process Issues and Version Control Team Work Deployment Integration Req. Satisfaction
1221694 João Pinto 1221694 - Justification 5 5 5 5 5 5
1220612 José Sá 1220612 - Justification 5 5 3 5 4 4
1201804 Rafael Araújo 1201804 - Justification 5 5 5 5 5 5
1220777 Rui Lima 1220777 - Justification 4 2 2 1 1 1
1221700 Vasco Sousa 1221700 - Justification 5 5 5 5 5 5