Initialize Counters->Iterate Through Heights->Update Maximum->Return … #206
Add this suggestion to a batch that can be applied as a single commit.
This suggestion is invalid because no changes were made to the code.
Suggestions cannot be applied while the pull request is closed.
Suggestions cannot be applied while viewing a subset of changes.
Only one suggestion per line can be applied in a batch.
Add this suggestion to a batch that can be applied as a single commit.
Applying suggestions on deleted lines is not supported.
You must change the existing code in this line in order to create a valid suggestion.
Outdated suggestions cannot be applied.
This suggestion has been applied or marked resolved.
Suggestions cannot be applied from pending reviews.
Suggestions cannot be applied on multi-line comments.
Suggestions cannot be applied while the pull request is queued to merge.
Suggestion cannot be applied right now. Please check back later.
Examples:
Input: arr[] = [1, 2, 2, 3, 2] Output: 1 Explanation: 1, 2, or 2, 3 are the only consecutive buildings with increasing heights thus maximum number of consecutive steps with an increase in gain in altitude would be 1 in both cases. Input: arr[] = [1, 2, 3, 4] Output: 3 Explanation: 1 to 2 to 3 to 4 is the jump of length 3 to have a maximum number of buildings with increasing heights, so maximum steps with increasing altitude becomes 3. Expected Time Complexity: O(n)
Expected Auxiliary Space: O(1)
Constraints:
1 <= arr.size() <= 106
1 <= arr[i] <= 105
Description
You are given the heights of consecutive buildings. You can move from the roof of a building to the roof of the next adjacent building. You need to find the maximum number of consecutive steps you can put forward such that you gain an increase in altitude with each step.
Type of Change
Checklist
Additional Notes
Please add any other information that is relevant to this pull request, including potential risks, alternative solutions considered, or future improvements.