Skip to content

Improvements to Base Protocol-Owned Liquidity #475

Improvements to Base Protocol-Owned Liquidity

Improvements to Base Protocol-Owned Liquidity #475

Triggered via pull request January 28, 2025 11:50
Status Failure
Total duration 40s
Artifacts

main.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

9 errors and 1 warning
build (arbitrum)
Process completed with exit code 1.
build (shared)
The job was canceled because "arbitrum" failed.
build (shared)
Process completed with exit code 1.
build (fantom)
The job was canceled because "arbitrum" failed.
build (fantom)
The operation was canceled.
build (polygon)
The job was canceled because "arbitrum" failed.
build (polygon)
The operation was canceled.
build (ethereum)
The job was canceled because "arbitrum" failed.
build (ethereum)
The operation was canceled.
build (arbitrum)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636