chore(deps): update ghcr.io/pingcap-qe/bases/tools-base docker tag to v1.8.0 #42
Triggered via pull request
December 15, 2023 12:29
Status
Failure
Total duration
10h 14m 7s
Artifacts
–
pull-cd-builder-images.yaml
on: pull_request
Matrix: build images with skaffold
Annotations
2 errors
build images with skaffold (builder-others, go-1.21, local-docker, linux/arm64)
The job running on runner GitHub Actions 6 has exceeded the maximum execution time of 360 minutes.
|
build images with skaffold (builder-others, go-1.21, local-docker, linux/arm64)
The operation was canceled.
|