Skip to content

chore: support for logstash handler #19

chore: support for logstash handler

chore: support for logstash handler #19

Triggered via push February 27, 2024 22:19
Status Failure
Total duration 50s
Artifacts

main.yml

on: push
Matrix: Build
Fit to window
Zoom out
Zoom in

Annotations

12 errors
Build (19)
Process completed with exit code 2.
Build (17)
The job was canceled because "_19" failed.
Build (17)
Process completed with exit code 2.
Build (20)
The job was canceled because "_19" failed.
Build (20)
The operation was canceled.
Build (21)
The job was canceled because "_19" failed.
Build (21)
The operation was canceled.
Build (18)
The job was canceled because "_19" failed.
Build (21)
Value cannot be null. (Parameter 'network')
Build (18)
The operation was canceled.
Build (16)
The job was canceled because "_19" failed.
Build (16)
The operation was canceled.