Skip to content

Weekly Slow Unit Tests #118

Weekly Slow Unit Tests

Weekly Slow Unit Tests #118

Triggered via schedule February 17, 2025 10:07
Status Failure
Total duration 1m 59s
Artifacts
Matrix: REST Client
Matrix: Events
Matrix: Metrics
Matrix: NWM Client
Matrix: NWIS Client
Matrix: SVI Client
Fit to window
Zoom out
Zoom in

Annotations

8 errors
SVI Client (3.10)
Process completed with exit code 1.
SVI Client (3.11)
Process completed with exit code 1.
SVI Client (3.12)
The job was canceled because "_3_10" failed.
SVI Client (3.12)
Process completed with exit code 1.
SVI Client (3.8)
The job was canceled because "_3_10" failed.
SVI Client (3.8)
The operation was canceled.
SVI Client (3.9)
The job was canceled because "_3_10" failed.
SVI Client (3.9)
The operation was canceled.