Weekly Slow Unit Tests #118
run_slow_unit_tests.yml
on: schedule
Matrix: REST Client
Matrix: Events
Matrix: Metrics
Matrix: NWM Client
Matrix: NWIS Client
Matrix: SVI Client
Annotations
8 errors
SVI Client (3.10)
Process completed with exit code 1.
|
SVI Client (3.11)
Process completed with exit code 1.
|
SVI Client (3.12)
The job was canceled because "_3_10" failed.
|
SVI Client (3.12)
Process completed with exit code 1.
|
SVI Client (3.8)
The job was canceled because "_3_10" failed.
|
SVI Client (3.8)
The operation was canceled.
|
SVI Client (3.9)
The job was canceled because "_3_10" failed.
|
SVI Client (3.9)
The operation was canceled.
|