chore: update dependency @graphql-tools/utils to ^10.5.4 #15583
Triggered via pull request
September 5, 2024 14:11
Status
Failure
Total duration
1h 27m 44s
Artifacts
–
continuous-integration.yml
on: pull_request
Matrix: Test
Test Benchmark
5m 59s
Code Lint
6m 57s
Commit Lint
6m 1s
Verify Docs
6m 24s
Post-Test
0s
Annotations
3 errors
Test (ubuntu-latest, 18)
Process completed with exit code 1.
|
Test (macos-latest, 20)
The job running on runner GitHub Actions 19 has exceeded the maximum execution time of 20 minutes.
|
Test (macos-latest, 20)
The operation was canceled.
|