chore: update dependency cacache to ^18.0.4 #15787
Triggered via pull request
September 24, 2024 14:04
Status
Failure
Total duration
1h 13m 27s
Artifacts
–
continuous-integration.yml
on: pull_request
Matrix: Test
Test Benchmark
6m 0s
Code Lint
6m 56s
Commit Lint
6m 0s
Verify Docs
6m 8s
Post-Test
0s
Annotations
2 errors
Test (macos-latest, 20)
The job running on runner GitHub Actions 20 has exceeded the maximum execution time of 20 minutes.
|
Test (macos-latest, 20)
The operation was canceled.
|