chore: update dependency rimraf to ^5.0.10 #15788
Triggered via pull request
September 24, 2024 14:04
Status
Failure
Total duration
1h 21m 41s
Artifacts
–
continuous-integration.yml
on: pull_request
Matrix: Test
Test Benchmark
5m 57s
Code Lint
7m 5s
Commit Lint
6m 1s
Verify Docs
6m 13s
Post-Test
0s
Annotations
2 errors
Test (macos-latest, 20)
The job running on runner GitHub Actions 8 has exceeded the maximum execution time of 20 minutes.
|
Test (macos-latest, 20)
The operation was canceled.
|