Skip to content

chore: update dependency loopback-connector-postgresql to ^7.1.6 #16057

chore: update dependency loopback-connector-postgresql to ^7.1.6

chore: update dependency loopback-connector-postgresql to ^7.1.6 #16057

Triggered via pull request October 24, 2024 03:04
Status Failure
Total duration 1h 0m 44s
Artifacts

continuous-integration.yml

on: pull_request
Matrix: Test
Post-Test
0s
Post-Test
Fit to window
Zoom out
Zoom in

Annotations

3 errors
Test (windows-latest, 20)
Process completed with exit code 1.
Test (macos-latest, 20)
The job running on runner GitHub Actions 13 has exceeded the maximum execution time of 20 minutes.
Test (macos-latest, 20)
The operation was canceled.