chore: update dependency ajv to ^8.17.1 #16112
continuous-integration.yml
on: pull_request
Matrix: Test
Test Benchmark
5m 52s
Code Lint
7m 6s
Commit Lint
6m 15s
Verify Docs
6m 13s
Post-Test
0s
Annotations
6 errors
Test (macos-latest, 20)
The job running on runner GitHub Actions 17 has exceeded the maximum execution time of 20 minutes.
|
Test (macos-latest, 20)
The operation was canceled.
|
Test (macos-latest, 20)
RPC failed; curl 92 HTTP/2 stream 5 was not closed cleanly: CANCEL (err 8)
|
Test (macos-latest, 20)
29834 bytes of body are still expected
|
Test (macos-latest, 20)
early EOF
|
Test (macos-latest, 20)
fetch-pack: invalid index-pack output
|