Skip to content

Basic&EVM tests / added test to check long chain of scheduled trx #3699

Basic&EVM tests / added test to check long chain of scheduled trx

Basic&EVM tests / added test to check long chain of scheduled trx #3699

Triggered via pull request February 20, 2025 12:53
Status Cancelled
Total duration 31m 38s
Artifacts 1

basic.yml

on: pull_request
Pre-commit hook validation
51s
Pre-commit hook validation
Prepare environment for proxy tests
15m 39s
Prepare environment for proxy tests
Dockerize neon tests
15m 52s
Dockerize neon tests
Run basic tests
0s
Run basic tests
Send notification on failure
0s
Send notification on failure
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 1 warning
Prepare environment for proxy tests
Terraform exited with code 1.
Prepare environment for proxy tests
Terraform exited with code 1.
Prepare environment for proxy tests
The action has timed out.
Run EVM tests
Canceling since a higher priority waiting request for 'Basic&EVM tests-refs/pull/523/merge' exists
Destroy stand
Process completed with exit code 1.
Destroy stand
No files were found with the provided path: ./logs/*. No artifacts will be uploaded.

Artifacts

Produced during runtime
Name Size
evm-allure-results.tar.gz
372 KB