Skip to content

Merge upstream 1.95 into Positron #38

Merge upstream 1.95 into Positron

Merge upstream 1.95 into Positron #38

Triggered via pull request December 12, 2024 00:30
Status Failure
Total duration 31m 1s
Billable time 1h 0m
Artifacts

test-pull-request.yml

on: pull_request
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 2 warnings
test / unit
Process completed with exit code 1.
e2e / electron (linux)
Tests failed
e2e / electron (linux)
Process completed with exit code 1.
test / integration
The job running on runner ubuntu-latest-4x_c53552bfe3cc has exceeded the maximum execution time of 30 minutes.
test / integration
The operation was canceled.
pr-tags
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
test / unit
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636