Skip to content

cache: lazy gc in ttl #23256

cache: lazy gc in ttl

cache: lazy gc in ttl #23256

Re-run triggered February 8, 2025 09:26
Status Failure
Total duration 4m 41s
Artifacts 7

pd-tests.yaml

on: pull_request
Matrix: chunks
report-coverage
0s
report-coverage
Fit to window
Zoom out
Zoom in

Annotations

5 errors
chunks (5, Tests(2))
Process completed with exit code 2.
chunks (6, Tools Test)
The job was canceled because "_5_Tests_2_" failed.
chunks (6, Tools Test)
The operation was canceled.
chunks (4, Tests(1))
The job was canceled because "_5_Tests_2_" failed.
chunks (4, Tests(1))
The operation was canceled.