Risk Assessment

Two ways to manage and identify key risks and issues in the project we are using are Trello dependency links and a Risk assessment table.

Task Dependencies

On our Trello board linking tasks via dependency links is a way to highlight to each member of the project whether or not the task they are working on is blocking or linked to another members task.

dependad dependada2


Risk Table

Another method for highlighting issues and risks that aren't necessarily on Trello cards/tasks is a Risk Assessment table. Here each risk is given an ID and description and then a probability and impact rating (Low, Medium, High). Risks with High in both categories are raised at each meeting to assess if the risk has been addressed. A column is also added to highlight which group of people on the project the risk most affects; Programmers, Artists, Level Designers, e.g.

Risk Table

| no | Very Unlikely | Unlikely | Possible | Likely | Highly Likely | | No Impact | Low | Low | Low | Med | Med | | Minor Impact | Low | Low | Med | Med | High | | Moderate Impact | Low | Med | Med | High| High | | Major impact | Med | Med | High | High | Very High | | Critical Impact | Med | High | High | Very High | Very High |

No. Description Probability Impact Affects Raised by
1 Length of game is getting too long Medium Medium Designers
2 Needing to learn new tools to complete certain aspects Low High Everyone
3 Constant design changes High High Everyone
4 Working on things that are out of scope Low High Everyone
5 Working and prioritizing the incorrect tasks Medium Medium Everyone
6 Not enough play testing Medium Medium Everyone
7 Unsure of what features are still needed Medium High Designers
8 Covid and motivation issues Hedium High Everyone
9 Not ensuring the codebase is well kept Medium Medium Programmers
10

Risks managed:

  • 1: The length of the Game has been scaled back and a set time length has been agreed on by the group (10-15min)
  • 2: Tied into rescoping of game, everyone's tasks have either been scaled back or assigned to someone who knows the tools
  • 7: Tied into rescoping, games core elements have been discussed at addressed
  • 4: Scope of the game has been discussed and each member is aware of what features are being included.